Moscow

Podolsk, Lenin Ave., 107/49, office 450

«peresvet» - manufacturer and supplier of metal structures throughout Russia

More than 150 specialists, including certified designers and engineers with experience of 5 years. 3 production and warehouse sites

History of the company's development

For over 19 years, Peresvet has been a reliable partner in the field of foundation solutions. During this time, we have gone from a small production facility to a leading industrial enterprise with several factories for the production of screw piles in Russia.
Наш
старт
2006 год

Founding of the company

The beginning of the journey

In 2006, the Peresvet company was founded with the aim of producing high-quality screw piles for the Russian market. The founders of the company, having extensive experience in metalworking and construction, saw the prospects of the developing pile foundation market.

2009 2011 годы

Strengthening positions

Formation of a production base

A period of active development of production technologies and preparation for large-scale expansion. The company invested in modern equipment and advanced training of employees.

2011 2012 годы

First major expansion

Construction of a plant in Vyshny Volochok

The implementation of an ambitious project to build its own production complex in the Tver region became a turning point in the company’s history.

Key features of the project:

  • Location: Vyshny Volochok, Tver region
  • Area: 5,000 m² of production facilities
  • Capacity: Up to 20,000 piles per year
  • Goal: Provision of the northwestern region of Russia
2015 год

A new round of development

Opening of the second production site in Podolsk

The opening of the production site on the territory of the legendary Ordzhonikidze Plant (ZIO) in Podolsk became a landmark event in the company’s history.

Project features:

  • Location: Podolsk, Ordzhonikidze plant territory
  • Legacy: Use of historical enterprise capacities
  • Equipment: Modernized production lines
  • Focus: Serving the central region of Russia
2016 2018 годы

The period of implementation of advanced technologies and obtaining key certificates.

Product certification

Product certification:

  • Compliance with GOST R 59106-2020
  • VNIITSi test reports
  • ISO 9001:2015 (quality management system)
2018 год

Development of the ZIO site

Large-scale modernization of Podolsk production

The comprehensive modernization of the production site on the territory of the Ordzhonikidze plant brought the enterprise to a new technological level.

Automation of production:

  • Implementation of robotic welding complexes
  • Automatic welding quality control systems
  • Conveyor system for transporting products
  • Automated warehouse for finished products

Laboratory base:

  • Creation of an accredited quality control laboratory
  • Test benches for strength testing
  • Non-destructive testing equipment
  • Document management and certification system
2019 2021 годы

Resilience in the face of challenges

A period of demonstrating the sustainability of the business model and the ability to develop even in difficult economic conditions. Despite the COVID-19 pandemic, the company continued to fulfill strategically important contracts.

2020 год

Lean Manufacturing Program

December 14, 2020 — Launch of the Lean Manufacturing program

Launch of the optimization program In the context of the global pandemic, the company not only remained resilient, but also launched an ambitious Lean Manufacturing program and a Learning by Doing project.

Program goals:

  • Optimization of production processes
  • Reduction of costs without compromising quality
  • Increasing the efficiency of resource use
  • Development of a corporate culture of continuous improvement
2022 год

Construction of a new plant

Large-scale expansion in Detkovo

The start of construction of the largest production complex in Detkovo, Chekhov district, became a logical continuation of a successful territorial development strategy.

Project characteristics:

Location and logistics:

  • Address: Detkovo village, Chekhov urban district
  • Land area: 15 hectares
  • Total area: 12,000 m² of production facilities
  • Fully automated lines

Implementation stages:

2022:

  • Obtaining building permits
  • Preparing the site and excavation work
  • Concluding contracts with contractors

2023-2024 year:

  • Construction of main production buildings
  • Connection of utilities
  • Installation of process equipment

2025 year:

  • Commissioning
  • Recruitment and training of personnel
  • Testing of production processes
2025 год Все еще впереди

Synergy of production sites

More than 150 specialists, including certified designers and engineers with 5 years of experience

Modern equipment and reliable materials

The production uses the best technological complexes from Russia, the USA, Turkey, China and Sweden, as well as steel from trusted suppliers. This approach ensures high precision, stable quality and durability of structures.

Quality confirmed by certificates

All products undergo strict control and have a guarantee of up to 15 years. Galvanizing and powder coating in accordance with the RAL palette, performed by the company’s own division, are possible. The protective zinc coating reliably prevents corrosion and oxidation, extending the service life of the products.

Certificates

Operating principles

  • Personal solutions for your needs
  • Meeting deadlines without compromise
  • Careful control at every stage
  • Durability and reliability

Find out the cost of your product

    Мы используем cookie-файлы для наилучшего представления нашего сайта. Продолжая использовать этот сайт, вы соглашаетесь с использованием cookie-файлов.
    Принять